Design + Engineering · Adaptive reuse

Lecco Hiking Centre Renovation

An adaptive-reuse design proposal transforming an existing Lecco building into a mountain-sports hub through architectural plans, existing-versus-proposed comparisons and envelope and construction studies.

The proposal links a new public program to the landscape through circulation and reuse of the existing building.
Diagram in text
Existing structure
Identify retained elements and site constraints.
Access and circulation
Rework the public approach and internal routes.
New program
Fit activities and gathering into the retained shell.
Envelope and junctions
Study old-to-new connections and construction.

Approach and contribution

30-second case brief

The project at a glance.

Question
An adaptive-reuse proposal transforming an existing site in Lecco into a hiking and mountain-sports hub with renewed circulation, envelope, and public identity.
Responsibility
Collaborative architectural and technical development
Methods
Politecnico di Milano · Adaptive-reuse studio
Result
Adaptive-reuse studio

Project scope and responsibility

Role
Collaborative architectural and technical development
Context
Politecnico di Milano · Adaptive-reuse studio
Focus
Adaptive reuse · Renovation · Public architecture · Envelope · Lecco

Overview

The Lecco Hiking Centre project explored how an existing building could support a new public program with a stronger relationship to the landscape and mountain-sports culture. The team developed an adaptive-reuse strategy that reorganized access and circulation, clarified old and new construction, and used the envelope to establish a renewed identity. The work centers on the transformation logic and coordinated technical relationship between retained structure, intervention, circulation, and public use.

Existing structure and new intervention are separated into a legible transformation strategy.

Selected evidence

A small set of project visuals communicates the central method, spatial idea, or evidence without reproducing the complete source report.

The technical strategy coordinates access, envelope, and old-to-new connections.

The complete project record

Full book

Read the complete report, thesis, or presentation here. Use the page controls to explore the original figures and methods.

Download PDF Open full PDF

Complete studio report · Group 12

Lecco Hiking Centre - Renovation

The original document, page by page.

The reader loads when you open the book.

Contact

Do you have a question or want to chat?

Analytics preferences

Optional Google Analytics uses cookies to measure page visits and engagement. You can browse the entire portfolio with analytics off.

Analytics is off in this browser.

Privacy details. Change your choice here at any time. Your preference is remembered for up to 180 days.