Design + Engineering · Healthcare

Behavioral Health Emergency Department

A 48-hour multidisciplinary concept for a calmer, clinically credible behavioral-health care environment.

Period
2025
Status
Third place · Unbuilt competition concept
Perspectives
Design · Engineering

30-second case brief

Question, responsibility, method, result.

Question
A 48-hour multidisciplinary concept for a calmer, clinically credible behavioral-health care environment.
Responsibility
Architectural/engineering coordination and integrated HVAC concept within Team Purple
Methods
DOAS · heat-recovery VRF · active chilled beams · radiant floor · BMS
Result
Third place · Unbuilt competition concept
The massing study connects a calmer patient-facing base with landscaped terraces and compact clinical floors.

Project scope and responsibility

Context
AIA AAH and ASHE PDC Student Design Challenge · Grady Memorial Hospital
Role
Architectural/engineering coordination and integrated HVAC concept within Team Purple
Systems
DOAS · heat-recovery VRF · active chilled beams · radiant floor · BMS
Format
48-hour multidisciplinary challenge
Recognition
Third place · Student Design Challenge
01 / 03

Overview

Behavioral-health emergency care must support safety and clinical workflows without making patients feel controlled or stigmatized. In a 48-hour multidisciplinary challenge, Team Purple developed an emergency-department and EmPATH expansion concept for Grady Memorial Hospital that paired a more humane spatial experience with a coordinated building-systems strategy.

The entry study connects a curved public edge, landscaped terraces, and the hospital context.
02 / 03

Planning and care zones

The proposal accommodates distinct care zones and microclimates while supporting healthcare ventilation requirements and a compact mechanical footprint. The plan organizes emergency, support, and EmPATH functions into legible zones.

The ground floor organizes emergency, support, and EmPATH functions into legible care zones.
Back to project navigation ↑
03 / 03

Integrated environmental systems

Ramyar contributed to architectural and engineering coordination and developed the HVAC concept: 100 percent outdoor air through a dedicated outdoor-air system, heat-recovery VRF, active chilled beams, radiant floor heating, and building-management controls for zoned operation. The team received third place.

Back to project navigation ↑

Contact

Interested in hiring me?