The preset uses NVIDIA's DSX cabinet TDP as a design basis. Load fraction, 98% liquid heat capture, water-reference properties, 500 kW CDU/plant blocks, 50 kW air units, power factor and response timings are editable training inputs. Shelf ratings describe equipment capacity separately from scenario heat and operating power.
NVL72 uses direct-to-chip cooling. Select the generic scenario to explore the other cooling architectures.
CRAH · Chilled-water room cooling
Room air crosses a chilled-water coil. Fans return cooled air to the racks; the facility-water loop carries heat to the plant.
24 racks. Generic modules represent complete net cooling paths. The NVL72 case sizes the warm-liquid plant, CDU and independent room-air modules separately. Enter the net IT heat that one module can remove at the selected operating point, after its auxiliary heat is accounted for. The design allowance defaults to 110% and stays at or above 100%; N rounds this sizing duty up to whole modules. Operating load changes the heat currently generated, independently of the design allowance.
Outdoor temperature sets the dry-cooler feasibility boundary. The entered chiller/DX COP is a fixed training input, not a weather-dependent equipment curve. Try 30°C and 40°C outdoors with the same warm-water setpoint.
One scenario · five engineering arrangements
Compare what stays connected.
Capacity reserves, independent distribution and uninterrupted cooling answer different questions. Set one event below; every arrangement uses the architecture, loads, weather and module duties selected above.
Connections, isolation and operating provisions
These are explicit scenario assumptions, not properties guaranteed by a redundancy label. A checked provision means it is included in this network model. On one-route arrangements it cannot create a second route.
In a dual-route test, maintenance removes the selected item on B; the injected fault acts on A. In a single route, both act on that route. A module under maintenance consumes a spare first. Planned maintenance prepositions available replacements; an unexpected fault waits for the pickup delay. A shared header or common cooling-power loss disables both routes until the event ends. No generator or UPS is assumed here. A common power event keeps cooling off for the source interruption plus the entered restart delay.
Equipment and connections
● Connected◇ Ready spare× Isolated / unavailable
Performance on the same time axis
Full-window results under the same scenario
Arrangement
Minimum usable capacity kW IT
Minimum actual removal kW IT
Shortfall kWh
Peak air bulk rise K
Cooling duty restored elapsed s
Air bulk recovered elapsed s
IT curtailed kWh
Flow interruption: Not evaluated. Module availability is not a hydraulic or airflow-continuity calculation.
Liquid / chip temperature: Not evaluated. Use the separate coupled-loop power-transfer mode for its stated boundary.
Outdoor heat rejection during faults: Not evaluated. The design-point balance below is separate from this transient dispatch model.
Equations, boundaries and interpretation
N is the whole number of duty modules required for the 110% design-sizing duty (or the edited allowance). N+1 and N+2 add one or two spares to every nonempty group on a single route. 2N duplicates the required groups on A and B. 2(N+1) gives each route its own spare in every group. A shared spare 2N+1 arrangement is not modeled.
Usable capacity is the maximum total IT heat supportable at the selected air/liquid split, after serial bottlenecks and connection states. Actual removal is limited by active IT heat in each circuit. Cooling shortfall = active IT heat − actual removal. Its integral is reported in kWh; it is not automatically stored heat. Rack shutdown reduces active demand and is reported separately as curtailed IT energy.
For the air circuit only, stored heat follows E(t + Δt) = max[0, E(t) + (air shortfall − available air recovery duty) × Δt]. Air bulk rise = E / effective air-side thermal capacity. This effective well-mixed store is not a rack-inlet or chip temperature prediction. Spare connected capacity can remove this store after pickup. Liquid shortfall is recorded as unremoved heat without assigning it to a fictitious flowing liquid inventory. A 100% liquid case therefore has no air-temperature result.
Net module duties are assumed available at the selected setpoints. Outdoor, air-coil, rear-door and CDU temperature approaches gate the relevant circuit. A feasible temperature check does not replace equipment performance curves or site design. The separate design-point balance includes auxiliary heat; the route transient tracks net IT heat only. The models share edited inputs, not unverified transient power or outdoor-rejection results.
All delays, spare dispatch, isolation behavior, loads and effective thermal capacities are training assumptions. The default 192 kW case uses three 80 kW duty paths and a 30 s pickup delay. Adding a spare can shorten a deficit without guaranteeing continuity. No cooling-capacity label alone establishes Tier III or IV.
resilience-workspace-20261030-v1 · Equipment counts, connection assumptions and interval heat balances are included in the export.
Design-point heat paths, flows, electrical demand and assumptions
01Server air
02CRAH coil
03Facility water
04Outdoor heat rejection
IT heat192.0 kW
Air / liquid heat192.0 / 0 kW
Cooling electrical demand—
Total environmental heat release—
Air side
Required server airflow
—
Required residual room-cooling airflow
—
Required external cooling-fan power
—
Liquid and plant
Required facility-water flow
—
Required technology-liquid circulation
—
Evaporation rate (two-phase)
—
Required pump / compressor power
—
Rack power, coolant and cooling groups
Balanced rack AC current—
Current per whip / planning allowance—
Technology supply → return—
TCS design-flow floor—
Independent capacity groups at the selected design-sizing allowance
Cooling group
Design heat · kW
Capacity per module · kW
N required
Installed modules
Inspect and edit the engineering assumptions
The 110% sizing allowance, 80 kW generic modules, 500/50 kW liquid/air modules, 30 s response, 150 kPa pressure rise, 65% efficiency, COP 4 and 3 kW outdoor auxiliary are selected demonstration values. They are not measured equipment performance or claims about common industry values; the NVL72 reference card identifies the sourced manufacturer values. Air uses ρ = 1.2 kg/m³ and cp = 1.006 kJ/(kg·K); facility water uses ρ = 1,000 kg/m³ and cp = 4.18 kJ/(kg·K). Enter the actual fluid properties for a selected liquid. The single-phase immersion preset uses illustrative dielectric properties of 1.6 kJ/(kg·K) and 800 kg/m³.
Flow requirements include the pump heat entering each liquid circuit. External fan heat enters the cooled air; pump work enters its respective fluid. The circuit rejection includes compressor work. Outdoor auxiliary electricity dissipates outside the fluid circuits and is added separately to the total environmental heat release. If a temperature approach is infeasible, required flows remain hypothetical sizing requirements and achieved operation is unavailable. In the NVL72 case the warm facility-water flow carries liquid-captured heat, while a separate low-temperature room-air unit uses the entered COP. Server-integral fans are already inside IT power. Rear doors are passive in this calculation; their server airflow carries the full rack heat. The two-phase value is an evaporation mass rate, not a pumping flow.
Compare the eight architecture requirements
One boundary · eight architectures
Compare the heat paths.
All rows use the current IT load, pressure rises, efficiencies and plant settings. Single-phase immersion uses the dielectric preset; two-phase immersion uses the entered latent heat. The table shows design-point requirements.
Calculated system requirements under the current assumptions
cooling-studio-20261030-v4 · Design-point balances with a linked five-arrangement network comparison. Inspect assumptions for the complete model boundary.
NVL72 continuous cooling and backup-power test
Interactive NVL72 power-transfer example
Keep the liquid moving. Keep its temperature controlled.
Compare a cooling interruption, a backed circulation pump, and backed circulation with thermal storage and residual-air cooling. Follow the coolant during the generator transfer.
The NVIDIA DSX reference ↗ describes GPU cooling using loop thermal mass during power outages. Uptime Institute's Tier explanation ↗ connects fault tolerance to the complete infrastructure. This calculation examines continuous cooling using stated power and thermal assumptions.
Cabinet heat uses the 330 kW DSX design basis per rack. The example holds IT power constant through a separate assumed IT supply. Liquid capture (98%), water-reference properties, inventory, backup capacity, pressure loss and response times are selected training inputs. Technology flow uses at least 1.5 L/min per cabinet design kW; changing operating heat alone does not reduce this design-flow floor. The continuity case starts at 40°C TCS supply, providing 5 K below the published inlet reference. The architecture preset above uses a separate 45°C steady design point. Each tool names its initial conditions explicitly.
Power and heat paths during the cooling-supply interruption
01Rack cold plates323.4 kW liquid heat
02Technology pumpUPS-backed circulation
03CDU + facility pumpUPS-backed circulation
04Mixed thermal buffer2,000 L usable
05Outdoor heat rejectionGenerator transfer + restart
Cooling UPSResidual-air cooling
Technology flow interruption—
Flowing-period peak / 45°C reference—
Cooling UPS operating load—
Nominal UPS energy for the transfer—
Facility volume for full bridge—
Liquid / room-air heat unserved—
Technology-loop flow · L/min
0125 min
Flowing technology supply · °C
0125 min
Assess flow, flowing supply temperature and residual-air service separately. A lower displayed temperature during an interrupted-flow case does not indicate better cooling: no supply or chip temperature is predicted during the gap. The shaded interval is the plant power outage, not necessarily a coolant-flow outage.
Fluid, power and thermal-storage inputs
Battery energy available to the cooling circuit = nominal kWh × usable fraction × conversion efficiency. Flow requires an energized pump circuit; thermal volume alone does not maintain circulation. With both loops circulating, heat is exchanged between the technology inventory and facility buffer through the modeled CDU. With only the technology pump running, that heat accumulates in the smaller technology-loop inventory.
The two well-mixed inventories obey CT dθT/dt = Qliquid + PT − QCDU and CF dθF/dt = PF + QCDU − Qplant. C = volume × density × specific heat. Temperature deviations θ are relative to the initial operating state. QCDU = Qliquid + PT + G(θT − θF) while both loops circulate; G is the entered per-rack effective coupling conductance multiplied by rack count. The TCS supply rises only with its own stored energy. Initial FWS temperature is derived from the same conductance and running duty.
The 65 kW/(K·rack) CDU conductance, 250 L and 2,000 L inventories, 170 kW recovery margin, 45 s generation delay and 15 s restart are selected training values, not equipment specifications or representative industry defaults. The plant rejects no liquid heat during transfer. After restart, it removes running duty plus a temperature-controlled recovery load, capped by the entered margin. Facility-volume sizing numerically solves this coupled model for the 45°C TCS reference, over the displayed simulation window, assuming adequate UPS energy and zero transfer gap. The window covers at least five minutes and at least three minutes after plant restart. A blank sizing result means no solution within the entered model's 20,000 L search range or no temperature headroom. Bulk-loop temperatures describe this mixed-inventory calculation; gaps indicate no circulation. The residual-air unit has an independent condenser auxiliary.
Same rack load. Three cooling-power arrangements.
Calculated under the current fluid, transfer, UPS and buffer assumptions
Geometry, plant operation and thermal response require different engineering models. The comparison below explains the inputs and outputs associated with each software role. The downloadable schedules provide a common numerical basis with explicit units and assumptions.
Each export regenerates equipment duties and counts, separate air/liquid hourly inputs, weather and water setpoints, and the selected event traces. Revit uses the equipment schedule; IES VE and eQUEST use the load and condition schedules for manual configuration. An editable EnergyPlus IDF contains an ideal air-side sensible balance for the selected air load and outdoor design point. These files are inputs, not completed native runs. Liquid heat remains in its separate schedule. The power-transfer and four-zone exercises retain their own explicitly named cases.
EnergyPlus 24.2 native run, 28 October 2026. Case A supplies 3916.8000 kWh of sensible IT heat; ideal sensible cooling removes 3916.8003 kWh. The small solver residual checks the controlled sensible-energy balance. This ideal-load test evaluates a fixed adiabatic zone, separately from equipment efficiency, airflow mixing and transfer continuity. All 24 reported hourly zone temperatures are 20°C to numerical precision. The run completed with zero warnings and severe errors.
The interactive tools use the linked analytical models. The native EnergyPlus output above is a separate sensible-load reconciliation. Revit, IES VE and eQUEST describe complementary software roles; the fixed one-rack schedule package supplies their common input basis. Its schedules contain equipment loads, flow requirements and event traces for comparison across BIM and energy models. A CFD analysis uses geometry, airflow boundaries and heat loads to resolve spatial temperatures and hotspots.
The review starts with the project jurisdiction and selected equipment. Each reference below identifies the evidence needed for its assessment. The current lab supplies heat balances, flow requirements and capacity-event comparisons.
Applied criteria for the named reference cases · model checks are distinct from code compliance
Matched-delay component/route tests, including planned isolation and a shared dependency
Cooling outcomes are evaluated by function. Whole-site Tier certification and TIA rating follow their own assessment frameworks.
Energy and safety design records
ASHRAE 90.4-2025; ASHRAE 15/34; NFPA 70, 75 and 110 as applicable
Design-point heat/power, native heat-balance record, distribution and transfer assumptions
Annual infrastructure energy, refrigerant/charge, electrical protection and emergency-system classification require the selected equipment and site design basis.
Jurisdiction and editions
Adopted building, mechanical, fire, plumbing, electrical and energy codes
Concept engineering basis; no construction site assigned
The construction design establishes adoption dates, amendments, authority having jurisdiction and applicable clauses.
Standards, equipment coordination and evidence register
A project location establishes the applicable editions, local amendments and authority having jurisdiction. Published editions and adopted requirements are recorded separately.
Evidence to inspect
Location, adoption record, occupancy/use, equipment arrangement and review of applicable clauses.
Air inlet, humidity, dew point and liquid temperature ranges are selected for the actual IT equipment class. Recommended and allowable conditions serve different purposes.
Evidence to inspect
Rack-inlet conditions, fluid properties and temperatures, selected equipment limits and dew-point margin.
The energy assessment addresses the relevant mechanical and electrical infrastructure methods in the selected edition. A single design-point power balance is one input to that assessment.
Evidence to inspect
Applicable edition, weather/load profiles, part-load curves, component energy and electrical-loss boundary.
Cooling pipework, immersion equipment, electrical supplies, detection and shutdown sequences must be coordinated with fire protection and maintenance access.
Evidence to inspect
Equipment listing/documentation, fluid characteristics, fire strategy and power/control diagrams.
Capacity redundancy, distribution paths, shared dependencies and maintenance states are evaluated together. N+1 and 2N describe arrangements; a Tier or rating requires assessment of the complete infrastructure.
Evidence to inspect
A/B paths, isolation points, power dependencies, failure scenarios and integrated testing.
Fluid compatibility, cleanliness, connections, filtration, leak detection and CDU interfaces are part of specifying a working liquid-cooling installation.
Evidence to inspect
Fluid specification, material compatibility, loop pressure/flow, connection and maintenance requirements.
Reference register · reviewed 28 October 2026
ASHRAE lists Standard 90.4-2025 as its published data-center energy standard. TIA lists revision C, May 2024. The applicable project editions and amendments are established through jurisdictional and contractual review.
At the reference load, the selected recirculation assumptions lower the hottest inlet by approximately 3.0°C (23.40°C open versus 20.43°C contained). The contained unit-outage trace peaks at 23.66°C. This analytical mixing sensitivity uses 25% open-aisle and 4% contained recirculation; the main sizing lab is a separate 100%-operating-load case.
Transfer reference · one NVL72 rack · 330 kW
With both loops and air cooling backed, the model retains flow and reaches 41.8°C peak flowing TCS supply during the 5-minute window. The 60-second bridge requires 0.19 kWh nominal battery energy at the entered usable fraction and conversion efficiency.
Case B · 40°C initial TCS · 250 L technology inventory · 2,000 L facility inventory · 65 kW/K effective coupling · 1 kWh cooling UPS
Cooling backup
No TCS flow · s
Peak flowing TCS · °C
Liquid / air heat unserved · kWh
No cooling UPS
60.0
Interrupted: 60.0 s without flow. 40.00°C while flowing only
5.390 / 0.110
Technology pump only
0.0
58.68°C
0.000 / 0.110
Both loops + residual air
0.0
41.85°C
0.000 / 0.000
The coupled model solves approximately 596 L of facility volume for the 45°C TCS reference over this window, assuming uninterrupted power to both loops and the air unit. This value depends on the 250 L technology inventory, effective CDU conductance, initial temperatures and recovery control. The 2,000 L reference buffer is evaluated with those same assumptions.
Sensitivity to connected buffer volume and CDU coupling
These half-to-double ranges bracket the selected 2,000 L participating facility inventory and 65 kW/(K·rack) effective CDU coupling. They illustrate model sensitivity, not measured equipment variation. Every row keeps one 330 kW rack, 250 L technology inventory, 40°C initial TCS supply, a 60 s transfer, 170 kW recovery margin and the 1 kWh both-loop/air UPS. Initial facility temperature is recalculated consistently with each conductance.
Same continuous-cooling model and five-minute window
The resulting design sequence is to control recirculation, size the liquid and air paths independently, verify the response of every serial component, and test cooling power continuity with finite battery energy. A sustainable IT capacity, an actual heat-removal rate and an IT shutdown are distinct results throughout the calculations.
Explore airflow, containment and rack-inlet temperatures
Interactive tool · calculated thermal scenarios
Operate the data hall.
Change the load, supply temperature, airflow, and containment. Compare rack-zone inlet temperatures, cooling margin, and a four-minute unit outage.
24 racks · four analytical zones3 units active
Hot return aisle ↑
R1R2R3R4R5R6R7R8R9R10R11R12
→ Cold supply aisle ←
R13R14R15R16R17R18R19R20R21R22R23R24
Hot return aisle ↓
Zone 120.4°C
Zone 220.4°C
Zone 320.4°C
Zone 420.4°C
IT heat load163.2 kW
Cooling capacity margin62.4 kW
Modeled cooling + fans54.7 kW
Hottest inlet · 15-minute event
How the calculation works +
Four rack zones use sensible heat balance and selected recirculation fractions (open 25%, partial 12%, contained 4%). The resulting approximately 3 K containment difference is an analytical mixing sensitivity to these inputs, not measured or CFD evidence. Equal zone inlet values occur when the proportional server flow and heat give the same rack temperature rise and every zone receives enough air. Lower fan speed exposes the unequal air-delivery allocation. The mixing rise is r/(1-r) × rack temperature rise. Capacity and COP follow explicitly assumed outdoor-temperature curves. The transient combines a 40-second mixing response with a 6 MJ/K effective hall heat capacity. Zone colors show calculated zone averages. The 80 kW modules, outdoor derate of 1.2% per K above 25°C, COP curve, 40 s mixing response and 6 MJ/K thermal store are selected training values, not common industry or manufacturer performance.
The temperature comparison uses the ASHRAE A1-A4 recommended dry-bulb inlet range of 18-27°C.